Enterprise-grade Microsoft Dynamics 365 Business Central + Power Apps — deployed with our AI-assisted BC-KickStart™ methodology and priced for Philippine SMEs.
From first setup to ongoing support, we deliver the full Microsoft Dynamics 365 Business Central lifecycle — productized, AI-accelerated, and built for Philippine compliance.
Fixed-scope deployment of Business Central SaaS — finance, sales, purchasing and inventory — configured, migrated, validated and live in as few as 10 working days — 20 working days where we migrate from a legacy ERP.
BC-KickStart™ methodologyRole-specific Power Apps front-ends, Power Automate workflows, certified EIS e-invoicing connectors, and integrations with banking, Office 365 and your existing tools.
Power Platform & APIsRole-based user manuals for Sales/AR, Purchasing/AP, Inventory and Finance — plus AI-generated training material and an in-app support bot your team will actually use.
Role-based enablementA two-week hypercare safety net at Systems LIVE, an AI support bot for everyday how-to questions, and ongoing system support that keeps your platform upgrade-safe and current.
Hypercare & ongoing supportDigitally-signed JSON e-invoices, near-real-time API transmission to the BIR within 3 days, and 10-year audit-ready retention — built into every implementation as standard.
e-Invoicing readinessOur roots: professional bookkeeping, taxation and statutory advisory. We make the system compliant and efficient — and work hand-in-hand with your accountant.
From the firm's heritageOur fixed-scope, AI-accelerated delivery compresses a traditional 8–16 week rollout into two work-weeks — five tightly-scoped sprints, each closed by a quality gate that must pass before the next begins.
Kickoff, AI requirements capture, tenant provisioning, PH localization and company setup.
RapidStart config package, posting groups, BIR tax & WHT, sales/purchasing/inventory.
AI data cleanup & mapping, master-data load, opening balances, reconciliation.
Process walkthroughs, AI-generated UAT, BIR report dry-run, user training.
Systems LIVE readiness, cutover, first live documents, hypercare & AI support handover.
Artificial intelligence isn't a bolt-on — it's woven through delivery to remove the tasks that traditionally consume the most consultant time, so you start from ~70% complete on Day 1.
Replaces multi-day discovery workshops — saving 2–3 days.
Replaces manual spreadsheet scrubbing — saving 2–4 days.
Replaces manual setup keying — saving 1–2 days.
Replaces hand-written test plans — plus an in-app support bot.
A hybrid model: a fixed-price rapid implementation plus a tiered SaaS subscription. Put finance on full seats and your frontline on low-cost Power Apps — enterprise ERP at SME prices.
Indicative pricing in PHP. Final commercials confirmed in a fixed-scope proposal. Microsoft license fees billed per seat. Per-user subscription fees are set by Microsoft in US dollars, so peso amounts are subject to change with exchange-rate movements.
Under Revenue Regulations 11-2025 (extended by RR 26-2025), covered taxpayers must issue structured, digitally-signed e-invoices to the BIR by 31 December 2026. We turn that deadline into a standard step of your deployment.
Our built-in EIS module builds the BIR JSON and signs it inside your own Microsoft tenant, then transmits straight to the BIR — no third-party service provider in between.
Invoice mapping to the BIR JSON schema, digital-signature config and API transmission are built into delivery — not an afterthought.
Power Automate flows manage transmission plus BIR accept/reject responses within the 3-day window.
Business Central + Azure storage satisfy the 10-year retention and audit-trail requirements.
EIS scope and dates are subject to BIR issuances; verify current coverage and deadlines with the BIR or a tax adviser before each engagement.
Not a mock-up. These are live screens from a configured Philippine deployment — the compliant invoice your customer receives, the EIS controls built into every posted invoice, and the transmission dashboard your finance team works from.
Investor-ready books, live in as few as 10 working days. Grow seat-by-seat as you scale.
Real ERP, EIS-ready and live in 10 working days (20 for legacy migrations) — without SAP/NetSuite cost or timelines.
Enterprise-grade Business Central + Power Apps your frontline will actually use.
We pair deep Business Central and Philippine-compliance expertise with a productized delivery model — so you get the rigor of enterprise consulting at the speed and cost a growing business can absorb.
AI-assisted, template-driven delivery — Systems LIVE in as few as 10 working days (20 for legacy migrations), versus 6–18 months for SAP or NetSuite.
BIR statutory setup, accountable forms and EIS e-invoicing are standard steps — not costly extras.
A predictable, fixed-cost engagement with clear in-scope boundaries — no timeline surprises, no runaway bills.
Native to Microsoft 365 — Dynamics 365 Business Central, Power Apps, Power Automate and Power BI, secure and upgrade-safe.
Low-cost frontline seats keep total cost far below per-user enterprise ERP.
Two-week hypercare, an AI support bot, and a structured Phase 2 roadmap when you're ready to grow.
Simplified Business Solutions began as a professional services firm delivering bookkeeping and taxation in Western Visayas. As our clients grew, so did we — expanding into Metro Manila and into the technology that runs modern finance and operations.
Today we deliver the full Microsoft Dynamics 365 Business Central lifecycle: setup and implementation, customization and integration, user training, and system support & helpdesk. Our accounting heritage is our edge — we don't just install software, we make it compliant, accurate, and genuinely useful for Filipino businesses.
Straight answers on the BIR deadlines, what an implementation really takes, and how the licensing works.
It applies if you are registered with the Large Taxpayers Service, classified as a large taxpayer under the Ease of Paying Taxes Act, engaged in e-commerce or internet-based selling, or already using a Computerized Accounting System, computerised books of accounts or e-invoicing software. Branches are covered as well as head offices. Other categories follow on BIR-announced dates.
Read more on EIS Compliance →Most businesses that keep computerised books need both. CAS registers the system; EIS transmits the invoice data. Holding a registered CAS is itself one of the four triggers that places you in the first EIS compliance group.
Read more on CAS vs EIS →Processing time varies by Revenue District Office and is not fixed by regulation. The controllable part is the quality of the pack and the demonstration — applications usually stall on incomplete flowcharts, unreconciled sample outputs, or an audit trail the evaluator cannot verify.
Read more on CAS Registration →Penalties of ₱1,000 to ₱50,000 per offence apply under the Tax Code. The operational consequence matters more: an inability to issue compliant invoices interrupts billing and collection.
Read more on EIS Compliance →A standard single-entity, non-legacy scope goes live in 10 working days with BC-KickStart, because roughly 70% of the configuration is pre-built. Where we migrate from a legacy ERP, the standard is 20 working days. Multi-entity consolidation, manufacturing, or significant integration work extends this to a phased delivery — we classify your scope before you sign.
Read more on Implementation →Essentials covers finance, purchasing, sales, inventory, projects and warehousing. Premium adds service management and manufacturing. If you assemble or produce goods, or run billable field service, you need Premium.
Read more on Implementation →The dividing line is whether your problems are within finance or across it. If the pain is bookkeeping speed, better accounting software may do. If it is inventory accuracy, job costing, approvals, multi-entity consolidation or compliance transmission, those are cross-functional and need an ERP.
Read more on ERP Readiness →No. Frontline users working through a Power App are licensed separately, rather than requiring a full Business Central seat. This is usually the largest single saving in a deployment with many operational staff.
Read more on Power Platform →Still deciding? Book a free EIS-readiness assessment and we will answer it for your business.
See your fixed-price, 10-day path to a compliant ERP (20 days for legacy migrations). Tell us about your business and we'll be in touch — no pitch, just a clear plan.
We typically respond within one business day.